Variable Speed Limits in Roadwork Sites
system  26. July 2013 at 13:01   more

Project Background


This project has been mandated at HA Divisional Director level in support of balancing traffic throughput at roadworks with safety.

Previous research in this area indicated potential benefits of using VSL through roadworks. Permanent sites that utilise VSL are the ATM system on. M42 Jets 3A-7 and the Controlled Motorway section on M25 Jets 12-15 (both required enabling regulations specific to those sites as they are not permitted under current legal provisions). Findings from those sites indicated smoother more consistent traffic conditions and roadworks on M4 Jets 14-18 & M5 Jet 28 have also indicated potential benefits of the implementation of VSL at future roadwork sites on the...
Control Room Human Factors Review - Guidance Document
system  26. July 2013 at 13:01   more

Project Background


The project was originally conceived to feed into the Highways Agency MOSAIC project which aimed to rationalise operational systems and provide a more “user friendly” interface to control room operators in RCCs. However, the MOSAIC project is no longer moving forward so the output of this project has been amended to provide a Human Factors guidance document which can be used for any Human Machine Interface that the Agency is developing.




Project Objectives


The activities undertaken to achieve the deliverable were:

1) Investigate and review existing approaches to interface design and specification.
2) Carry out an initial desktop study of...
Managed Motorways In-Vehicle Data Requirements
system  26. July 2013 at 13:01   more

Project Background


In December 2009 the Highways Agency (Network Services) commissioned a study into the implications of the use of current and future in-vehicle travel information devices on Controlled and Managed sections of the motorway network. The study aimed to discover and assess the challenges faced by the Highways Agency and to propose a suitable action plan to ensure continued achievement of the Highways Agency's core objectives, whilst embracing the market driven shift to in-vehicle driver information provision.




Project Objectives


The study identifies the requirements that will facilitate the future integration of in-vehicle devices into the ITS infrastructure. The...
ITS international radar (incorporating ITS radar & EU watch activities)
system  26. July 2013 at 13:01   more

Project Background


The HA has a desire to inform and be informed about developments in ITS. Since 2003 EU Watch and more recently ITS Radar have been successfully providing intelligence on new ITS developments to the HA. Both projects have significant numbers of HA subscribers who use the services to acquire knowledge and assist them in development of their projects. In addition, the HA has a particular interest in becoming more integrated with Europe. The work of the European Commission affects national activities, and along with European ITS projects, influences activities and projects in the UK.




Project Objectives


To gather intelligence on ITS activities, identify...
MESA PHASE II & III
system  26. July 2013 at 13:01   more

Project Background


Currently in the UK there is no standard communications and management infrastructure across the emergency services for use during major road incidents. Even with the adoption of the new TETRA radio system (which includes Police, Fire and Ambulance services in addition to the HA and others), the level of communication is limited to voice and very low-rate data, thereby preventing the use of high-resolution, real-time video and other essential diagnostic and disaster co-ordination data. The Highways Agency has launched its Traffic Officers (HATO) Service patrolling the motorways in liveried vehicles, replacing the Police response to some incidents on the network. The agency must therefore be prepared for,...
Ramp Metering Algorithm Development and Modification Definition
system  26. July 2013 at 13:01   more

Project Background


Ramp Metering currently generates an average of 13% reduction in journey time delays across all sites. The existing ramp metering system needs to be modified to make it more effective, reliable and cheaper to install and operate.




Project Objectives


Make ramp metering more effective, more applicable, and easier to install and calibrate reducing the overall whole life costs and increasing the benefits provided by Ramp Metering at the 100 sites where Ramp Metering is installed or proposed.




Project Summary


Initial findings from the modelling works suggest that increased benefits should be provided by these...
Existing Motorway Minimum Requirements (EMMR)
system  26. July 2013 at 13:01   more

Project Background


The HA role has changed from that of a network builder to that of a network operator and asset manager. The Design Manual for Roads and Bridges (DMRB) was originally developed for design of new roads and represents a collection of knowledge and good practice, but may not best meet the challenges of the modern network; where capacity enhancement schemes have to be undertaken on or near live motorways and thus must reflect operational and maintenance constraints as well as the nature of the existing highway. In recent years this has resulted in a significant increase in the number of departures from standard. This is expensive both in terms of designer time to prepare the departure submissions and the time...
Managed Motorways Foresighting
system  26. July 2013 at 13:01   more

Project Background


In January 2009 by the Secretary of State for Transport confirmed the commitment to invest £6bn in the strategic road network. A significant part of that investment is associated with the delivery of 14 hard shoulder running (HSR) schemes. Based on this the HA Board agreed to set up an integrated Delivery Office for Managed Motorways to facilitate integrated and collaborative working.
The Delivery Office is made up of core representatives from the directorates across the Agency to ensure collaborative working.
With the emphasis on delivery of schemes and putting them into safe and successful operation, the Managed Motorways programme draws on contributions from across the Agency.
Managed Motorways Ground Investigation framework
system  26. July 2013 at 13:01   more

Project Background


In January 2009 by the Secretary of State for Transport confirmed the commitment to invest £6bn in the strategic road network. A significant part of that investment is associated with the delivery of 14 hard shoulder running (HSR) schemes. Based on this the HA Board agreed to set up an integrated Delivery Office for Managed Motorways to facilitate integrated and collaborative working. The role of the Delivery Office is to:

a) Integrate user requirements, project delivery, commissioning and operation including related NOD dependent activities (e.g. Regional Control Centre (RCC) upgrading).

b) Coordinate schemes within a single programme to deliver Managed Motorways in the most...
Managed Motorways Monitoring/Evaluation of Through Junction Running (TJR)
system  26. July 2013 at 13:01   more

Project Background


Managed Motorway schemes aim to address congestion issues and improve Journey Time Reliabilty by utilising a set of advanced intelligent transport systems applications to make as much use of the available road capacity as possible. The M42 Managed Motorway has been monitored and evaluated throughout its trial and varying operational regimes which has enabled informed decisions on the rollout of other Managed Motorway schemes. This trend will continue with the evaluation of the new operating regime of Through Junction running and the 3 year validated safety report which are due to be published in March 2011




Project Objectives


M42 - Through Junction Running...
 1  2  3  4  5  6  7  8  9  10  11  12  13  14  15 ... 
978 content matches search / total 978 content

 
research info
 
RRAF search
title abstract
full text keywords
   
Sort order
Filters
 

HOME  RESEARCH PROJECTS  RESOURCES  NEWS